Around 6:30am the Level Volunteers were alerted for a Engine, Tanker, and Supply for a dwelling Fire w/ Rescue. Chief 9 arrived to find a 2 Story SFD with fire through the roof. Upon arrival E-113's crew assisted with search and overhaul operations. K-121 arrived and immediately joined in the tanker shuttle, while S-181 set up a draft at Rt.543 and Walters Mill Rd. Level Units operated on scene for approximately 3 hours before returning to service.